Four more CCG sections now open

Four new sections of the transformative Connswater Community Greenway opened to the public last week, featuring a further 4kms of new cycle and pedestrian paths, two new play parks, two new multi-use games areas and two new bridges. These new sections mark the journey towards the completion of the Greenway in the next few weeks.

The locations of the four new sections and key features are;

·         Newtownards Road to Connswater Link; New pedestrian and cycle path (110ms), flood walls, lighting, seats, signage, landscaping, works to the river, and a toucan crossing.

·         Avoniel Leisure Centre to Beersbridge Road; New pedestrian and cycle path (1.5kms), new play park, new MUGA (multi use games area), new bridge, lighting, seats, signage, landscaping and flood walls.

·         Castlereagh Road to Ladas Way; New pedestrian and cycle path (1km), riverside boardwalk, new play park, new MUGA (multi use games area), lighting, seats, signage, landscaping and a toucan crossing.

·         Ladas Drive to Montgomery Road; New pedestrian and cycle path (1.5km), riverside boardwalk, new bridge, lighting, benches, bins, signage, landscaping and flood walls.

In April, Connswater Community Greenway will encourage the public to help with the naming of the two new play parks, two new bridges and two new links.